What are scaffold platform construction requirements?Įach platform must be planked and decked as fully as possible with the space between the platform and uprights not more than 1 inch (2.5 centimeters) wide. For conditions other than listed above, contact Breault Industrial Group, Inc.Deflection Is Based On Federal OSHA Maximum Span ( In Inches) Divided by 60 – Flat Use.Dry conditions are defined as an environment whereas the moisture content does not exceed 19%. The design properties for GripStrip” Scaffold Plank are based on dry use conditions.Heavy Duty (75 psi) (Workers-Considerable Storage of Materials) Medium Duty (50 psi) (Workers-Some Storage of Materials) Light Duty (25 psi) (Workers-Minimal Storage of Materials)
Load Supported over Specified Distance (inches) (Federal OSHA Duty Rating) Proof Loading Solid Sawn DI65 Scaffold Plank GripStrip Scaffold Plank Load & Span Chart